North Cuplock

H20/S150 as Top Structure

Durable Versatile Safe

BENEFITS :

1: Highly cost effective.
2: Rapid cycle times with S150 top structure system.
3:  Simple to use and familiar to labour force.
4:  Very flexible, suited to almost any slab.
5: Very safe system, especially for leading edges at height.
6:  Proven system.
7: Crane independent

North Cuplock with S150 top structure uses traditional Cuplock with high performance S150 composite timber beam.
This fusion creates a very effective solution for medium to high slabs and can prove extremely economic and very stable.
Using Cuplock as falsework means it is still simple and flexible and by using S150 as in the top structure speeds up erection saving time and money.