Project Description

This involves the construction of the LA Plage Tower 2 proposed G+7P+1st TYP+36 Typ
Floor+1 Tech Floor,” indicating a complex high-rise building with extensive typical floors, a ground floor, service/parking floors (SP), and a dedicated technical floor. The formwork system, Cuplock scaffolding is being used in conjunction with aluminum beams and Orma formwork for the slabs and vertical supports. This combination of systems suggests a robust and adaptable solution for high-rise construction, enabling efficient concrete pouring and structural development of the multi-story tower.

AL THURIAH CONTRACTING